Home
About
Sustainability
Details & Conditions Gallery
Project Detail Request
SITURA Technical Manual
SITURA
Products
RedLINE
®
FlamLINE
®
AquaLINE
®
SITURA
Joint Selector
SITURA
Projects
AT&T Cardinal Data Center, Kings Mountain, NC
Aulani A Disney Resort Spa, Hawaii
City Place Skybridge, Toronto
Colbert Hall Plaza, Newport, RI
Clorox Building, Oakland, CA
Discovery Creative and Technology Center, Silver Spring, MD
Grace Cathedral, San Francisco, CA
Georgia World Congress Centre, Atlanta, GA
Harbour Square Water Garden, Washington, DC
Résidence du Gouverneur Général, Québec City, QC
Payments
Submittal
Package
Generator
Contact
DILAFLEX
Login
Rep
Login
FlamLINE
®
Modified Bitumen Torched
Below is a slideshow of images detailing the application of
FlamLINE
®
with
Modified Bitumen (Torched)
.
Use the Previous/Next buttons beside the images to move forward or back through the slideshow.
Alternatively, use the drop-down menu to jump to a specific point in the installation.
Joint being prepared, batt insulation being placed.
FlamLINE laid out, prior to torching.
Torching the FlamLINE to the base sheet.
Torching – Note the base sheet asphalt is being liquified.
Flashing in the FlamLINE with a cap sheet.
The flashed in FlamLINE with gland exposed.
Finished FlamLINE Installation.